Hainan Steel teach you: steel erection workplace layout principles

贬颈迟蝉:2034 罢颈尘别:2015-7-1
  

Hainan Steel teach you: steel erection workplace layout principles


(1) water sequencing hoisting place to minimize traffic to prevent back flow.
(2) According to the production needs of the operating area of reasonable arrangements to ensure that the materials and parts have to be places of accumulation.
(3) to ensure the smooth operation of the crane, hoisting member smoothly.
(4) facilitate electricity, water supply, power supply line arrangement.
(5) should deal with the attention and gentle ground connection of the road, in order to ensure the passage of vehicles.
(6) before installation response infrastructure and elevation axes, embedded board position, elevation reviewed checked. Hainan Steel